The pipeline system includes all stainless steel systems of the whole ship, such as liquid cargo system, tank sweeping system, oil and gas recovery system, tank washing system, cargo tank ventilation system;
The installation form includes unit chip assembly, section or total section pre-installation, ship platform or shipping installation, and complete dock installation;
The service scope includes positioning installation, assembly and pairing, welding, inspection, non-destructive testing, pressure test, utility test, cleaning, debugging, etc.;
The ship types served are from 5000t chemical tanker to 158000t chemical tanker;