Gas system installation

  • Description
  • Additional Information

The pipeline system includes a filling system, a gas delivery system, a cabin communication pipe, etc.;


The installation form includes unit chip assembly, section or total section pre-installation, ship platform or shipping installation, and complete dock installation;


The service scope includes positioning installation, assembly and pairing, welding, inspection, nondestructive testing, pressure test, utility test, cleaning, insulation laying, commissioning, etc.;


The scope of technical services includes design, calculation and analysis of double-walled pipelines, and submission of drawings, materials, and technical support in the process.


The ship types served range from 7500m³ bunkering vessels to 174000m³ LNG carriers;